Christmas slowed down construction but it didn't stop. Some crews made their way in over the break to keep the project moving.
Main stairway, still needs finishing work. |
Wall covering in the Boardroom going up. |
We have doors in the Pro Shop. |
All public space in the basement is finished with wall coverings and crown molding. |
The bar's bulk head is framed up. |
The Grill room ceiling looks fantastic. |
Sanding the drywall, ready for paint. |
We have come a long way from this Grill room view. |
No comments:
Post a Comment