Friday, January 30, 2015

End of January Clubhouse Tour

Already at the end of January, soon the front doors of the new clubhouse will swing open welcoming the members back to a highly anticipated 2015 season.

Lets take a look at what was completed this month.

Front foyer fabulous stone work.

This type of lighting is prominent throughout the building.

Fireplace, a focal point as it should be. 

Chandeliers for the Grill room. 

Bar looking good.
Ceiling detail on the Garden entrance.
Men's Washroom off the main dining hall.
Women's washroom entrance off main dining hall.

Porter area between locker rooms complete. 

Women lockers are in (just the boxes, the doors not installed)

Locker room vanity



Significant upgrade in our showers

Lined up and ready for opening field day. 


Tuesday, January 6, 2015

Working over the holiday

Christmas slowed down construction but it didn't stop. Some crews made their way in over the break to keep the project moving. 
Main stairway, still needs finishing work.

Wall covering in the Boardroom going up.

We have doors in the Pro Shop. 

All public space in the basement is finished with wall coverings and crown molding.

The bar's bulk head is framed up. 

The Grill room ceiling looks fantastic.
 
Sanding the drywall, ready for paint.

We have come a long way from this Grill room view.